Engineering × digital operations
From first inquiry
to lifetime service.
Engineering systems and digital operations — connected in one platform.
- Refrigeration
- Heat Pumps
- Air Conditioning
- Ventilation
- BMS & AI
Bilingual EN / DEEnglish & Deutsch throughout
GDPR by designPrivacy-first data handling
Secure documentsEncrypted & access-controlled
Full audit trailImmutable activity log
Lifecycle serviceFrom planning to performance
One company. One operating system.
All engineering, operations and service workflows connected in a single platform — built for industrial environments.
- Inquiry & CRMFrom first contact to qualified lead
- ProjectsPlan, track & collaborate
- DocumentsProposals, drawings & contracts
- Service operationsTickets, visits & maintenance
- Equipment registryAssets, systems & configurations
- HACCP CloudTemperature, events & compliance
- Client portalSecure access for every customer
Engineering expertise, digitally connected.
Our solutions combine premium German engineering with intelligent software for operations that scale.

Refrigeration
Industrial & commercial cold-chain systems.

Heat Pumps
Efficient heating & cooling solutions.

Air Conditioning
Precision climate control systems.

Ventilation
Healthy air & energy recovery systems.

BMS & AI
Smart monitoring, analytics & automation.
Every inquiry becomes a controlled process.
Centralise inquiries, collaborate with your team and move deals forward with full visibility.
Inquiry 24
+ 21 more
Review 16
+ 13 more
Consultation 12
+ 9 more
Proposal 9
+ 6 more
Confirmed 8
+ 5 more
- Inquiry
- CRM
- Follow-up
- Proposal
- Confirmed project
Documents stay complete — not scattered.
All project documents in one secure place, with clear statuses and approval workflows.
- ProposalDraft
- ContractAwaiting approval
- InvoiceIssued
- DrawingsPublished
- HACCP reportsRecorded
- CertificatesValid
- AcceptanceApproved
- WarrantyActive
Version history, sent & opened timestamps, and bilingual EN/DE proposal generation — with owner approval before anything is published.
The real project lifecycle.
From first contact to long-term service — every step connected and accountable.
- InquireCapture needs and scope
- PlanDesign, specify and schedule
- BuildInstall, test and commission
- OperateMonitor, maintain and optimise
- EvolveUpgrade and extend
Service operations, under control.
All equipment, service tickets and maintenance — in one operational view.
| ID | System | Location | Status | Next service |
|---|---|---|---|---|
| EQ-00127 | Walk-in cooler 04 | Main Street Butcher | Active | 12 Oct 2026 |
| EQ-00114 | Booster rack | Downtown Grill | Active | 26 Sep 2026 |
| EQ-00098 | Chiller plant | Coastal Hotel | Active | 03 Nov 2026 |
| EQ-00076 | Air handling unit 02 | Riverside DC | Service due | 08 Sep 2026 |
Planned maintenance sends reminders before every due date — nothing slips through.
- 27Open
- 11In progress
- 4On hold
- 93%SLA met
- HighTK-2026-142Walk-in cooler not cooling
- MediumTK-2026-139Ice machine leaking
- LowTK-2026-137Door alignment check
- Received
- Assessed
- Scheduled
- In progress
- Closed
Appointments that respect real availability.
Book consultations and site visits with transparent time options — one preferred date plus two alternatives.
October 2026
- Available
- Occupied
- Blocked
- Weekends & public holidays
Your request
- Preferred dateTue, 13 Oct 202610:00
- Alternative 1Thu, 15 Oct 202614:00
- Alternative 2Tue, 20 Oct 202609:00
Weekends, public holidays and occupied slots are blocked automatically. Attach a site plan as PDF or JPG to help us prepare.
Request appointmentAudit-ready temperature history — with every door event explained.
24/7 cloud recording with door-open events and full traceability.
Cold Room 02 Normal
Temperature log · 31 Aug 2026, 00:00 – 23:59
- Temperature (°C)
- Upper limit (4.0 °C)
- Lower limit (−2.5 °C)
- Door-open event
- Normal range
- Current−1.7 °C
- Minimum−2.1 °C at 05:44
- Maximum4.2 °C at 12:06
- Average−1.6 °C
- Time in range99.5%
- Deviations1 7 min
Events (24 h)
- Door-open events6
- Total door-open time29 min
- Temperature deviations1
- Total deviation time7 min
Compressor run time
- Total run time15 h 42 min
- Starts12
- Longest run2 h 18 min
- Total stop time8 h 18 min
Sensor & system
- Sensor statusHealthy
- Calibration due12 Nov 2026
- Battery level100%
- Signal strengthExcellent
Cloud subscription active — 2 years of data retained in accordance with HACCP and food-safety requirements.
A clear portal for every client.
Each client sees their sites, projects, visits, equipment and documents — securely, in one place.
Active project — AHU upgrade
- Assessment
- Engineering
- Installation
- Commissioning
Open service tickets
3
- HighCold room compressor check
- MediumFilter replacement
- LowPanel light flickering
Next technician visit
Tue, 08 Sep 2026 · 09:30
- Preventive maintenance — AHU 02
- An on-site contact must be reachable by phone
Recent documents
- Proposal_2041-DE.pdfSent · 12 Aug 2026
- Drawing_AHU-02.pdfUpdated · 21 Aug 2026
- HACCP_Report_Aug.pdfRecorded · 31 Aug 2026
One click to open a new service request — routed straight into the JuKo service board.
Accountability built into every action.
Roles, permissions and immutable audit logs for trusted operations.
| Area | Owner | Office admin | Coordinator | Technician |
|---|---|---|---|---|
| Projects | ||||
| Documents | ||||
| Service tickets | ||||
| HACCP Cloud | ||||
| Publishing | — | — | — |
BACnet / Modbus protocol files are protected — visible to the owner only.
- Appointment date changedRiverside DC · by Office admin
- Proposal PDF generated (DE)Project 2041 · by Coordinator
- Protected file access deniedbacnet-config · Technician role
- HACCP report recordedCold Room 02 · System
Append-only history — entries can never be edited or deleted.
Knowledge that moves work forward.
Structured articles and standards — published only after owner approval.
- Draft
HACCP temperature limits
Guidelines and recording requirements for refrigerated storage.
- Awaiting owner approval
Preventive maintenance best practices
Schedules, checks and documentation for HVAC systems.
- Published
Walk-in cooler installation guide
A step-by-step overview from site survey to handover.
- Draft
- Awaiting owner approval
- Published
Built in phases. Built to last.
A clear roadmap that delivers value early and scales thoughtfully.
Phase 1
Foundation
- Corporate website & multilingual content
- CMS & knowledge base
- Inquiries, CRM & follow-ups
- Projects, documents & workflows
- Consultation booking
- SEO, analytics & notifications
Phase 2
Operations & Intelligence
- Service tickets & field operations
- Equipment registry & asset insights
- Client portal & role management
- HACCP Cloud monitoring & compliance
- Bilingual proposal generation
- Protected BACnet / Modbus file storage
Let's engineer the system — and the process behind it.
Start your project the right way.
- Fast responseTypically within one business day
- Structured processClear steps from first call to delivery
- Engineering + softwareOne team for systems and operations
- Built for industrial useSecure, reliable and future-ready